Bankyard reads the engineer’s plan set sheet by sheet and writes your dirt, pipe and concrete takeoff. Every quantity shows the sheet it came from, ready to price and send as a proposal.
Works from the PDF the engineer sends · on your phone or at your desk
Reads the whole set, not just the sheet you’re looking at.
C-100 Cover & site dataC-101 Site planC-201 GradingC-301 StormC-401 UtilitiesC-501 Details
What it takes off
Dirt, pipe and concrete. The work you self-perform.
Bankyard is built for the contractor who digs it, lays it and pours it. It takes off the items you price, in the units you price them in.
Dirt
Mass grading, pads and the site balance, with swell and shrink built in.
Cut and fillCY
Topsoil strip and respreadCY
Building pad select fillCCY
Aggregate base, fine gradeTON · SY
Export, import, truck loadsLCY · LDS
Silt fence, inlet protectionLF · EA
Pipe
Storm, sanitary, water and fire, by size and material, with trench quantities.
Pipe runs by size and materialLF
Manholes, inlets, headwallsEA
Depth from rim and invertVF
Trench excavation, backfillCY
Bedding stoneTON
Valves, hydrants, fittings, tapsEA
Concrete
Flatwork, curb, foundations and walls, down to yards and rebar.
Curb and gutterLF
Sidewalk, slabs, pavingSF · CY
Footings, grade beams, piersLF · EA
Retaining and stem wallsLF · CY
Rebar and wire meshLB · SF
Tilt-up panels, if you build themSF
The takeoff you get
Every number shows its work.
Your estimator checks the takeoff instead of counting it. Each line says which sheet it came from and how it was figured. Anything read off the drawing is flagged to verify.
Counted once. Plan and profile sheets show the same pipe. Bankyard counts each run and structure one time.
Scales read for you. Written scales, graphic scale bars and half-size sets are caught sheet by sheet.
Questions for the engineer. Missing inverts and unclear bedding come back as a list you can send.
Riverside Retail Pad Site
Quantity takeoff
6 sheets read Scale 1" = 30'
Item
Qty
Sheet
How it was figured
Earthwork
Mass excavation
3,130 CY From plans
C‑100
Earthwork summary on the cover sheet
Strip topsoil 6"
4,360 CY Measured
C‑201
Limits of disturbance, 5.40 AC
Storm drain
15" RCP
456 LF From plans
C‑301
3 labeled runs, 0.50–0.80%, depth from structure table
48" storm manhole
3 EA From plans
C‑301
STMH-1 to STMH-3, avg 6.2' rim to invert
Concrete
24" curb & gutter
1,480 LF Measured
C‑101
Curb layer in the engineer’s CAD file
Sidewalk 4"
1,920 SF Check
C‑101
Read off the drawing at scale
Dumpster pad 8"
— Measure
C‑101
Shown on the plan, size not dimensioned
Questions for the engineer
Bedding class for the 15" RCP isn’t called out. Use Class B per detail 4/C-501?
No outlet invert given at STMH-2.
Example output from a sample plan set. Your takeoff comes from your plans.
How it works
From the engineer’s PDF to a proposal
Upload the plans
Drop in the PDF set the engineer sent, on your phone or your computer. Big sets are fine.
Each quantity links to its sheet. Trace anything on the plan to confirm it, or leave out work you sub out.
Price it and send it
Your costs, your overhead, your markup and alternates, out the door as a PDF proposal.
Built for the way you bid
The rest of the bid, handled
Know your real overhead
Turn last year’s numbers into the overhead rate each job has to carry, and see what happens if volume drops.
Leave out what you don’t build
Switch off tilt walls, paving or anything you sub out. The proposal lists it as by others.
Alternates priced right
Add alternates carry your full markup, so a yes on an alternate doesn’t cost you money.
Proposals in your name
Your logo, scope by division, exclusions and terms, as a clean PDF ready to send.
Bid board
Every bid with its due date and status, plus your hit rate and backlog at a glance.
Ask the estimator
Ask about your numbers in plain English, like “what if trucking goes to $95 an hour?”, and get the answer from your bid.
Questions
What estimators ask first
What plans does it read?
The PDF plan set the engineer sends: site, grading, utility, paving, erosion control and detail sheets. PDFs exported from CAD read best. Scanned sets work too, with more items flagged to verify.
Does it replace my estimator?
No. It does the first pass so your estimator can check and price instead of counting. Every quantity shows where it came from, so nothing is a black box.
How does it handle plan and profile sheets?
Pipe shows up on plan sheets and again on profiles. Bankyard counts each run and each structure once, and uses the profiles and structure tables for depths.
Can I leave out work I don’t self-perform?
Yes. Turn off any kind of work in your company settings. It stays out of your price and shows up on the proposal as by others.
Does it work on my phone?
Yes. Upload plans, check quantities and send a proposal from your phone. A bigger screen helps when you trace items on the plan.
Who can see my plans and numbers?
Only the people in your company account. Your costs and bids are yours.
Bid more work. Count less dirt.
Start a free trial and run your next plan set through Bankyard.